TM 5-3805-293-23-3
0133
REMOVAL CONTINUED
12. Disconnect and remove hose (Figure 6, Item 8) and O-ring (Figure 6, Item 9) from tube (Figure 6, Item 1).
Discard O-ring.
13. Disconnect and remove hose (Figure 6, Item 7) and O-ring (Figure 6, Item 6) from tube (Figure 6, Item 5).
Discard O-ring.
14. Disconnect and remove tube (Figure 6, Item 1) and O-ring (Figure 6, Item 2) from valve bank (Figure 6,
Item 3). Discard O-ring.
15. Disconnect and remove tube (Figure 6, Item 5) and O-ring (Figure 6, Item 4) from valve bank (Figure 6,
Item 3). Discard O-ring.
Figure 6. Valve Bank and Tubes.
0133
END OF TASK
CLEANING AND INSPECTION
000133
Clean and inspect all parts IAW Mechanical General Maintenance Instructions (WP 0346).
END OF TASK
INSTALLATION
000133
N OT E
Install lines as tagged at removal.
1. Install new O-ring (Figure 6, Item 4) and connect tube (Figure 6, Item 5) to valve bank (Figure 6, Item 3).
2. Install new O-ring (Figure 6, Item 2) and connect tube (Figure 6, Item 1) to valve bank (Figure 6, Item 3).
3. Install new O-ring (Figure 6, Item 6) and connect hose (Figure 6, Item 7) to tube (Figure 6, Item 5).
4. Install new O-ring (Figure 6, Item 9) and connect hose (Figure 6, Item 8) to tube (Figure 6, Item 1).