TM 5-3805-263-14&P-3
DISASSEMBLY AND ASSEMBLY
AIR DRYER
NOTE: Clean all parts before assembly. Use new O-
rings, gasket (9) and U-cup (2). Put lubricant on all seals
before assembly
1.
Install O-ring (10) and gasket (9) on shaft (5)
2.
Install shaft (5) into cover (4).
3.
Put O-ring (8) on cover (4).
4.
Put U-cup (2) and O-ring (6) on purge valve (3).
5.
Install purge valve (3) into valve body (1).
6.
Put spring (7) into valve body (1) and install cover
(4) into the valve body.
7.
Install shaft and valve body assembly (13) into
housing (11). Install O-ring (12) on the housing.
61207X'
8.
Install O-ring (16) on cartridge (15). Install center
post assembly (14) into the cartridge.
9.
Pour the desiccant from package (17) into cartridge
(15). Hit the side of the cartridge several times with
a soft hammer to make the desiccant go (settle)
into place.
3-280D