TM 5-3805-261-34BRAKES MAINTENANCE.6-9.AirBrakeLines. (Sheet 5 of 8)CLEANINGClean all parts. Refer to Chapter 2.INSPECTIONInspect all parts. Refer to Chapter2.INSTALLATIONNOTESteps 1 thru 14 are for the installationof the lines from the right side of theair reservoir to the air brake valve.Installation of the lines on the leftside of the air reservoir is identical.1.Install connector (55), elbow(54), check valve (53) and tee(52, Figure 6-23).2.Install nipple (51).3.Install solenoid valve (50) andelbow (49).4.Install hose assembly (48).5.Install nipple (47) and checkvalve (46).6.Install hose assembly (45).7.Connect hose assembly (45) toparking brake actuator andrelease valve.8.Install clip (44), washer (43)and bolt (42).Go to Sheet 66-35
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business