TM 5-3805-261-34
FUEL SYSTEM MAINTENANCE. (cont)
3-25.
Fuel Injection Pump. (Sheet 1 of 16)
This task covers:
a.
Removal
b.
Cleaning
c.
Inspection
d.
Installation
e.
Testing
INITIAL SETUP:
Applicable Configurations
Personnel Required
All
Construction equipment
repairer MOS 63G
Tools
General Mechanics Tool Kit:
References
Automotive (NSN 5180-00-
TM 5-3805-261-10
177-7033)
TM 5-3805-261-20
Hoist and sling
Timing pin 6V4186
Special Environmental Conditions
Wrench 8S4613
None
Extractor 8S2244
Locator plate 6V2016
General Safety Instructions
Driver 6V4818
None
Sleeve FT1443
1-3/4 inch contact pin
Torques
Wood block
Except for special torques shown,
all fasteners are tightened to
Test Equipment
standard torques. Refer to
Spring tester
Appendix E.
Materials/Parts
Dry cleaning solvent,
Item 15, Appendix C
Detergent, Item 9, Appendix C
Clean cloths, Item 41,
Appendix C
Small tags, Item 43,
Appendix C
Gaskets, Items 16, 34
Cotter pin, Item 1
Lubricating oil, Item 33,
Appendix C
Felt washers, Item 17
Preformed packings, Items 5, 10,
11, 12, 13, 19, 47, 49, 51
Caps
Bearings, Items 42, 43, 44, 45
Go to Sheet 2
3-116