• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BLADE LIFT BAR ASSEMBLY MAINTENANCE
BLADE LIFT BAR ASSEMBLY MAINTENANCE - CONTINUED

Maintenance Manual For Grader, Road, Motorized, Diesel Engine Driven, Heavy, Commercial Construction Equipment
Page Navigation
  473    474    475    476    477  478  479    480    481    482    483  
img
TM 5-3805-261-23-2
BLADE LIFT BAR ASSEMBLY MAINTENANCE - CONTINUED
0340 00
REMOVAL
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during proce-
dure. Failure to follow this warning may cause injury to personnel.
NOTE
Centershift cylinder weighs 40 lb (18 kg).
1.
Attach sling to centershift cylinder (2).
2.
Remove two bolts (8), lockwashers (7), cap (6), shim(s) (4 and 5), inserts (3 and 9), and shim(s) (10 and 11). Move cen-
tershift cylinder (2) clear of blade lift bar (1). Discard lockwashers.
3.
Remove sling.
NOTE
Left side blade lift cylinder not shown for clarity.
Place centershift lock assembly hoses on top of frame.
1
2
3456
7
8
11
10 9
397-1674
0340 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.