• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ARTICULATION HITCH BEARING REPLACEMENT (TYPE II MACHINE) - CONTINUED
ROPS REPLACEMENT (CCE MACHINE)

Maintenance Manual For Grader, Road, Motorized, Diesel Engine Driven, Heavy, Commercial Construction Equipment
Page Navigation
  359    360    361    362    363  364  365    366    367    368    369  
img
.
TM 5-3805-261-23-2
ARTICULATION HITCH BEARING REPLACEMENT (TYPE II MACHINE) - CONTINUED
0326 00
DISASSEMBLY - CONTINUED
23
13
14
15
24
25
22
21
26
30
16
29
27
20
17
28
19
18
397-2408
CLEANING AND INSPECTION
Clean and inspect all parts in accordance with WP 0020 00.
ASSEMBLY
1.
Install cap (18), new seal (17), bearing (19), shim (20), new seal (16), spacer (13), cap and fitting (21 and 22), new lock-
washers (15), and bolts (14).
2.
Install pin (23), sleeve spacer (24), shim (25), retaining plate (26), new lockwashers (27 and 30), and bolts (28 and 29).
3.
Install bearing (11) and new seals (10 and 12).
4.
Install shim (4).
5.
Install pin (5) and collar (6).
6.
Install cover (7), new lockwashers (3 and 8), bolts (2 and 9), and fitting (1).
7.
Reassemble machine (TM 5-3805-261-10).
END OF WORK PACKAGE
0326 00-3/(-4 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.