TM 5-3805-261-23-2
ARTICULATION HITCH BEARING REPLACEMENT (CCE AND TYPE I MACHINES) - CONTINUED
0325 00
INSTALLATION - CONTINUED
13.
Position cap (3) over bearing (7) on top of lower pin
bore of front frame.
14.
Install three of seven new lockwashers (4) and three of
seven bolts (5) through caps (3). Ensure there is at
least one hole between each of the three bolts (5).
15.
Position cap (3) on bearing (7). Do not install shims at
this time.
16.
Evenly and gradually tighten each bolt (5) to 65 lb-ft
5
(88 Nm).
4
17.
Ensure cap (3) is even with bottom of frame.
3
FRONT FRAME
LOWER PIN BORE
7
397-1975
18.
Use feeler gauge to measure distance between front
5
frame and upper cap (3). Check distance at each bolt
(5) location.
FRONT FRAME
FEELER GAUGE
3
397-1976
0325 00-7