• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRANSMISSION CONTROL RELIEF VALVE MAINTENANCE - CONTINUED
TRANSMISSION CONTROL RELIEF VALVE MAINTENANCE - CONTINUED

Maintenance Manual For Grader, Road, Motorized, Diesel Engine Driven, Heavy, Commercial Construction Equipment
Page Navigation
  146    147    148    149    150  151  152    153    154    155    156  
img
TM 5-3805-261-23-2
TRANSMISSION CONTROL RELIEF VALVE MAINTENANCE - CONTINUED
0296 00
REMOVAL - CONTINUED
9.
Support valve assembly (4).
10.
Remove four bolts (17), washers (18), and valve
assembly (4).
18
17
4
397-4139
11.
Remove and discard seven preformed packings (19)
19
from valve assembly (4).
19
19
19
4
397-4140
CLEANING AND INSPECTION
Clean and inspect all parts in accordance with WP 0020 00.
INSTALLATION
1.
Install seven new preformed packings (19) in valve assembly (4).
2.
Position valve assembly (4).
3.
Install four washers (18) and bolts (17).
0296 00-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.