TM 5-3805-261-23-1
RIGHT BLADE LIFT, ARTICULATION, AND CENTERSHIFT CHECK VALVE
MAINTENANCE - CONTINUED
0235 00
INSTALLATION - CONTINUED
25.
Start engine (TM 5-3805-261-10).
26.
Operate control levers and cycle system through at least five or more full-travel movements to bleed air from system.
27.
Stop engine and check for leaks.
28.
NOTE
5
12
16
Preform steps 29 through 42 to install
17
valve that functions as right blade lift
6
check valve.
29.
Install new preformed packing (19) and elbow (13) to
check valve (12) assembly.
30.
Install new preformed packing (18) and elbow (11).
31.
Install new preformed packing (17) and elbow (6).
13
19
18
11
397-688
32.
Install new preformed packing (16) and elbow (5).
33.
Install check valve (12) assembly to machine with
three washers (4) and bolts (2).
34.
Install new preformed packing (10) and connect hose
assembly (9) to elbow (11).
35.
Install new preformed packing (8) and connect hose
assembly (7) to elbow (6).
36.
Install new preformed packing (14) and connect tee
6
(15) to elbow (13).
5
3
4
37.
Install new preformed packing (3) and connect tee (1)
to elbow (5).
12
8 7
9
15
10
11
12
13
14
397-687
38.
Start engine (TM 5-3805-261-10).
39.
Operate control levers and cycle system through at least five full-travel movements to bleed air from system.
40.
Stop engine and check for leaks.
41.
END OF WORK PACKAGE
0235 00-12