TM 5-3805-261-23-1
RIGHT BLADE LIFT, ARTICULATION, AND CENTERSHIFT CHECK VALVE
MAINTENANCE - CONTINUED
0235 00
REMOVAL - CONTINUED
NOTE
Perform steps 22 through 31 to remove valve that functions as centershift check valve.
22.
Remove nine bolts (42), washers (41 and 43), and frame cover (40) from machine.
23.
Disconnect hose assembly (51) from connector (49). Remove and discard preformed packing (50).
24.
Remove connector (49) and preformed packing (48) from check valve (12) assembly. Discard preformed packing.
25.
Disconnect hose assembly (44) from connector (46). Remove and discard preformed packing (45).
26.
Remove connector (46) and preformed packing (47). Discard preformed packing.
40
41 42
43
51
50
49
48
44
45
46
47
12
397-685
0235 00-5