TM 5-3805-261-23-1
ALTERNATOR GROUND LEAD REPLACEMENT - CONTINUED
0127 00
REMOVAL
NOTE
Tag alternator ground lead before disconnecting to aid in installation.
1.
Remove screw (1) and lockwasher (2) and disconnect alternator ground lead (3) and lockwasher (4) from alternator (7).
2.
Disconnect capacitor (5) and remove lockwasher (6). Discard lockwasher.
1
2
3
4
1
6
5
7
7
397-432
CLEANING AND INSPECTION
Clean and inspect all parts in accordance with WP 0021 00.
INSTALLATION
1.
Install new lockwasher (6) and connect capacitor (5).
2.
Install new lockwasher (4), lead (3), new lockwasher (2), and screw (1) on alternator (7).
3.
4.
5.
END OF WORK PACKAGE
0127 00-2