TM 5-3805-261-20
OPERATORS PANEL CONSOLE MAINTENANCE. (cont)
7-28.
Floodlight Switches. (Sheet 3 of 3)
INSTALLATION
1.
Install two terminals (7), washers (6) and
screws (5) on switch (3, Figure 7-43).
2.
Connect
two
wire
assemblies
(4)
to
terminals (7).
3.
Install switch (3), lockwasher (2) and new
lock nut (1) in operators panel console.
NOTE
Return
130G
Grader
to
original
equipment condition.
Figure 7-43
End of Task
7-80