TM 5-3805-293-23-5
0341
INSTALLATION CONTINUED
000341
4. Route hose (Figure 7, Item 2) through engine enclosure cover (Figure 7, Item 1).
5. Install hose (Figure 7, Item 2) and clamp (Figure 7, Item 3) on arctic heater (Figure 7, Item 4).
Figure 7. Arctic Heater Coolant Supply Line.
0341