TM 5-3805-293-23-4
0253
INSTALLATION CONTINUED
N OT E
Install shims only if required.
8. Install new shims (Figure 14, Item 3), pin (Figure 14, Item 4), new cotter pin (Figure 14, Item 2), spacer
(Figure 14, Item 5), washer (Figure 14, Item 7), and bolt (Figure 14, Item 6) on front frame.
9. Install new O-ring (Figure 14, Item 11) and connect hydraulic hose (Figure 14, Item 10) to right articulation
cylinder (Figure 14, Item 1).
10. Install new O-ring (Figure 14, Item 9) and hydraulic hose (Figure 14, Item 8) on right articulation cylinder
(Figure 14, Item 1)
Figure 14. Front Articulation Cylinder Pin.
0253