TM 5-3805-293-23-3
0142
PREPARATION FOR TURN-IN CONTINUED
N OT E
Align spline on charge pump with transmission.
24. Install O-ring (Figure 41, Item 12), charge pump (Figure 41, Item 7), two washers (Figure 41, Item 6), bolts
(Figure 41, Item 5), washer (Figure 41, Item 9) and bolt (Figure 41, Item 8) on transmission (Figure 41,
Item 10).
25. Install O-ring (Figure 41, Item 15), tube (Figure 41, Item 4), two clamps (Figure 41, Item 3), four washers
(Figure 41, Item 1), and bolts (Figure 41, Item 2) on charge pump (Figure 41, Item 7).
26. Install O-ring (Figure 41, Item 11), filter housing (Figure 41, Item 14), and three bolts (Figure 41, Item 13) on
charge pump (Figure 41, Item 7).
Figure 41. Charge Pump.
0142