TM 5-3805-263-14&P-3
SECTION III
REPAIR PARTS SUPPLY
3-1.
General:
A. The basic policies and procedures in AR 710-2 and AR 725-50 are generally applicable to repair parts
management for CCE items.
B. Manufacturer's parts manuals are furnished with CCE Items instead of Department of the Army Repair Parts
and Special Tools List (RPSTL).
C. National Stock Numbers (NSNs) are initially assigned only to PLL/ASL parts and major assemblies, i.e.,
engines, transmissions, etc. Additional NSNs are assigned by the supply support activities as demands warrant.
D. Automated Processing (AUTODIN) of Federal Supply Code for Manufacturers (FSCM) part number
requisition, without edit for matching NSNs and exception data, is authorized.
E. Proper use of project codes and weapon system. Designator codes on parts requisitions is essential.
F. Repair parts are available from commercial sources and may be purchased locally in accordance with AR
710-2 and AR 735-110.
G. Initial Prescribed Load List (PLL) and Authorized Stock List (ASL) will be distributed by the US Army Tank-
Automotive Command (TACOM), ATTN: ARSTA-MVB.
3-2.
Prescribed Load List (PLL). The PLL distributed by TACOM is an extimated 15 day supply recommended for
initial stockage at organizational maintenance. Management of PLL items will be governed by the provisions of AR 710-2
and local command procedures. Selection of PLL parts for shipment to CONUS/OCONUS units are based upon the
receiving command's recommendation after their review of the TACOM prepared list. Organization and activities in
CONUS/OCONUS will establish PLL stocks through the normal requisitioning process.
3-3.
Authorized Stockage List (ASL). The ASL distributed by TACOM is an estimated 45 day supply of repair parts
for support units and activities. The ASL parts will be shipped according to the recommendations of the receiving
commands after they have reviewed the initial list distributed by TACOM. Support units and activities in CONUS/OCONUS
will establish ASL stocks through the normal requisitioning process.
3-4.
Requisitioning Repair Parts.
A. Using Units/Organization: Requisition (DA For 2765 Series) will be prepared according to AR 710-2 and local
command directives. Units in CONUS will use project code "BGW" in Block 19. Units OCONUS will enter in Block l9
project code "JZC", See Appendix H.
7