TM 5-3805-261-23-2
COMBINATION VALVE MAINTENANCE - CONTINUED
0323 00
INSTALLATION
1.
Position combination valve (56).
52
53
54
2.
Install new preformed packing (55) and connector
(54).
55
3.
Install new O-ring (53) and connect hose assembly
(52).
60
4.
Install new preformed packing (57) and connector
(60).
59
5.
Install new O-ring (58) and connect hose assembly
(59) to connector (60).
56
58
57
397-554
6.
Install new preformed packing (49), new O-rings (45
45
and 50), valve (48), adapter (47), and tee (44).
46
44
7.
Connect hose assembly (46) to tee (44).
47
8.
Connect hose assembly (51) to tee (44).
48
49
50
51
397-553
0323 00-18