TM 5-3805-261-23-2
TANDEM DRIVE CHAIN ASSEMBLY REPLACEMENT - CONTINUED
0311 00
CLEANING AND INSPECTION
1.
Inspect chain for wear and elongation. Measure 12 links at 610 lb (277 kg) of tension. Maximum elongation of chain is
24.72 in (62.9 cm).
2.
Clean and inspect all other parts in accordance with WP 0020 00.
INSTALLATION
NOTE
Master link should be installed with the bar (15) toward the other chain. Ensure the master links of the two
chains are not side by side on the same tooth of the drive sprocket.
1.
Position chain (17) with ends of the chain at the openings of tandem drive housing (5).
2.
Install ratchet assembly on chain (17).
17
5
397-4243
3.
Install puller attachment and two legs on chain (17).
4.
Install link (14) in ends of chain (17).
5.
Remove ratchet assembly from chain (17).
14
6.
Install bar (15) on link (14).
PULLER
7.
Remove puller attachment and two legs from chain
ASSEMBLY
(17).
8.
Install two new cotter pins (16) in link (14).
5
15
17
397-4242
16
0311 00-4