• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FINAL DRIVE ASSEMBLY REPLACEMENT - CONTINUED
FINAL DRIVE ASSEMBLY REPLACEMENT - CONTINUED

Maintenance Manual For Grader, Road, Motorized, Diesel Engine Driven, Heavy, Commercial Construction Equipment
Page Navigation
  233    234    235    236    237  238  239    240    241    242    243  
img
TM 5-3805-261-23-2
FINAL DRIVE ASSEMBLY REPLACEMENT - CONTINUED
0309 00
REMOVAL - CONTINUED
9.
Install two 3/4-10NC forcing screws in housing (19).
LINK BRACKET
Tighten each forcing screw a small amount at a time,
AND SLING
alternating between screws, until housing has been
moved far enough out on the studs to install a link
bracket sling on housing. Put axleshaft (18) in position
17
in housing to keep planet carrier assembly (17) in bal-
18
ance. Use link bracket sling to carefully remove planet
carrier assembly from machine.
10.
Install wire from forcing screws behind housing
assembly (19) across planet carrier assembly (17) to
keep inner components from falling.
3/4-10 NC
19
FORCING SCREW
WIRE
397-4227
11.
Position housing (23) on blocks with planet carrier
20
(22) facing up. Remove wire and forcing screws from
housing.
21
12.
Remove preformed packing (20) and gear (21). Dis-
card preformed packing.
WIRE
3/4-10 NC
FORCING SCREW
23
22
397-4228
0309 00-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.