TM 5-3805-261-23-2
ENGINE REPLACEMENT - CONTINUED
0267 00
INSTALLATION - CONTINUED
5
34.
Install cable assemblies (15 and 16), new lockwasher
4
67
(14), cable assembly (13), new lockwasher (12), and
8
3
nut (11) to starting motor (17). Tighten nut to 22 lb-ft
(30 Nm).
35.
Install cable assemblies (9 and 10), wire assembly (6),
new lockwasher (7), and nut (8) to solenoid "battery"
terminal. Tighten nut to 22 lb-ft (30 Nm).
9
36.
Install wire assembly (4) at terminal and nut (5) on
10
11
13 12
16 15 14
17
397-2304
37.
Open fuel shutoff valve (2) on fuel tank (1) to turn fuel
on.
1
2
397-1274
38.
Install hydraulic pump drive (WP 0232 00).
39.
Install fuel pressure switch (WP 0115 00).
40.
Install exhaust muffler and pipe (WP 0051 00).
41.
Install turbocharger lines and hoses (WP 0039 00).
42.
Connect transmission oil cooler line (WP 0298 00).
43.
Connect compressor line to air dryer (WP 0164 00).
44.
Connect heater hoses to engine (WP 0211 00).
45.
Install air cleaner body (WP 0038 00).
46.
Install fuel tank (WP 0044 00).
47.
Install supplemental steering motor (with pump) (WP 0091 00).
48.
Install engine compartment dash plate (WP 0183 00).
49.
Install radiator inlet and outlet tubes (WP 0057 00).
50.
Refill radiator to proper level (WP 0065 00).
51.
Refill engine oil crankcase to proper level (WP 0024 00).
52.
Install battery cables (WP 0024 00).
53.
54.
55.
Check for leaks.
56.
Stop engine.
END OF WORK PACKAGE
0267 00-13/(-14 Blank)