TM 5-3805-261-23-1
SIDESHIFT CHECK AND RELIEF VALVE REPLACEMENT - CONTINUED
0240 00
INSTALLATION - CONTINUED
5.
Install new preformed packing (13) and elbow (5).
6.
Install new preformed packing (12) and elbow (7) on check valve (11).
7.
Install new preformed packings (6 and 8).
8.
Connect hose assemblies (10 and 9) on elbows (7 and 5).
9.
Start engine (TM 5-3805-261-10).
10.
Operate levers and cycle system through at least five full-travel movements to bleed air from system.
11.
Stop engine and check for leaks.
12.
13.
Install frame cover (4) on machine with eight washers (3 and 2) and bolts (1).
23
4
1
56
78
9
10
13
12
11
397-679
END OF WORK PACKAGE
0240 00-4