TM 5-3805-261-23-1
SIDESHIFT LINES REPLACEMENT - CONTINUED
0228 00
INSTALLATION - CONTINUED
17.
Install new preformed packings (6 and 8) and connec-
5
tors (5 and 7).
6
7
8
397-784
18.
Install new O-rings (2 and 3) and hose assemblies (1
1
2
3
and 4).
4
397-783
19.
20.
Check level of hydraulic tank and fill as necessary (WP 0216 00).
21.
Start engine (TM 5-3805-261-10).
22.
Operate control levers. Move system through at least five-full movements of travel to bleed air from system.
23.
Stop engine and check for leaks.
24.
END OF WORK PACKAGE
0228 00-12