TM 5-3805-261-23-1
ARTICULATION LINES, FITTINGS, AND HOSES REPLACEMENT - CONTINUED
0227 00
INSTALLATION - CONTINUED
17.
Install new preformed packing (12), elbow (11), new
preformed packing (13), elbow (15), and new O-ring
(16) to articulation check valve (14).
18.
Position hose assemblies (3 and 6) on machine.
1
19.
Connect hose assemblies (3 and 6).
20.
Install new preformed packing (2), elbow (5), new O-
ring (4), new preformed packing (9), elbow (8), and
new O-ring (7) to right control valve group (1).
2
21.
Install hose assemblies (3 and 6).
14
15
16
22.
23.
13
24.
12
25.
3
5 4
11
6
10
8 7 6
3
9
397-2377
26.
Check lever of hydraulic tank and fill as necessary (WP 0216 00).
27.
Start engine (TM 5-3805-261-10).
28.
Operate control levers. Move system through at least five full movements of travel to bleed air from system.
29.
Stop engine and check for leaks.
END OF WORK PACKAGE
0227 00-6