TM 5-3805-261-23-1
ARTICULATION LINES, FITTINGS, AND HOSES REPLACEMENT - CONTINUED
0227 00
CLEANING AND INSPECTION
Clean and inspect all parts in accordance with WP 0020 00.
INSTALLATION
1.
Install new preformed packing (56), connector (55), new O-ring (58), new preformed packing (59), connector (60), and
new O-ring (61) to articulation cylinder (57) under left side of engine compartment.
2.
Position hose assemblies (38 and 39) on machine.
3.
Connect hose assemblies (38 and 39) to connectors (55 and 60).
4.
Install clamp (54), washer (63), and bolt (62).
29 30 31 32 33 34 35 36 24
5.
Install new preformed packing (53), connector (47),
28
new O-ring (52), new preformed packing (51), con-
27
nector (50), and new O-ring (49) to articulation cylin-
der (48) under right side of engine compartment.
26
6.
Position hose assemblies (26 and 27) on machine.
7.
Connect hose assemblies (26 and 27) to connectors
37
(47 and 50).
46
8.
Install two new preformed packings (42), fittings (41),
45
elbows (40), and new O-rings (37) to centering valve
44
(32) under right rear side of cab.
39 38
42 41 40 17
9.
Install hose assemblies (38 and 39) to elbows (40).
43
10.
Install two new preformed packings (31), fittings (30),
397-2378
elbows (29), and new O-rings (28) to centering valve
(32) on front side.
11.
Install hose assemblies (26 and 27) to elbows (29).
19
12.
Install new preformed packing (46), fitting (45),
18
elbow (44), new O-ring (43), new preformed packing
(33), fitting (34), elbow (35), and new O-ring (36) to
centering valve (32).
17
13.
Position hose assemblies (17 and 24) on machine.
25
14.
Install hose assemblies (17 and 24) elbow (44 and 35).
24
23
15.
Install new preformed packing (20), fitting (21),
14
22
elbow (22), new O-ring (23), new preformed packing
21
397-779
(19), fitting (18), and new O-ring (25) to articulation
20
check valve (14).
16.
Install hose assemblies (17 and 24) to fitting (18) and
elbow (22).
0227 00-5