TM 5-3805-261-23-1
FRONT WIPER (UPPER) MAINTENANCE (CCE MACHINE) - CONTINUED
0207 00
INSTALLATION
1.
Position motor (1) and plate (19) in upper storage compartment inside cab.
2.
Connect three wire assemblies (18) at terminals to motor (1). Close center door (20).
1
18
19
20
397-641
3.
Install two new lockwashers (6) and bolts (7) in upper-front exterior of cab while assistant holds motor (1) in cab inte-
rior.
4.
Install new gasket (8), washer (9), new snap ring (10), nut (11), cap (12), and driver (13). Tighten nut to 180 lb-in. (20
Nm).
5.
Install clip (16), blade assembly (17), screw (15), and new locknut (14) on arm assembly (5).
5
8 9 10 11 12 13
6
7
1
15
14
16
17
397-640
0207 00-5