TM 5-3805-261-23-1
PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) INTRODUCTION - CONTINUED
0022 00
PMCS INITIAL SETUP
1.
General. This work package lists tools, materials, and personnel required for PMCS and lubrication.
2.
a.
Common no. 1 shop set
b.
General mechanic's tool kit
3.
a.
Antifreeze
b.
Cleaning compound, solvent
c.
Cloth, abrasive, emery, fine
d.
Detergent
e.
Grease, GAA
f.
Insulating varnish, electrical
g.
Lubricating oil, OE/HDO 10W/30
h.
Lubricating oil, OE/HDO 15W/40
i.
Lubricating oil, OE, HDO 30
j.
Lubricating oil, OEA
k.
Lubricating oil, GO 80W/90
l.
Lubricating oil, GO 75
m.
Lubricating oil, Molybdenum Disulfide, Silicone
n.
Rags
4.
Personnel.
a.
Driver/Operator
b.
Unit Maintenance Mechanic
0022 00-4