• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STEERING VALVE MAINTENANCE (SINGLE VALVE DESIGN) - CONTINUED
COMBINATION VALVE MAINTENANCE

Maintenance Manual For Grader, Road, Motorized, Diesel Engine Driven, Heavy, Commercial Construction Equipment
Page Navigation
  310    311    312    313    314  315  316    317    318    319    320  
img
.
TM 5-3805-261-23-2
STEERING VALVE MAINTENANCE (SINGLE VALVE DESIGN) - CONTINUED
0322 00
INSTALLATION
1.
Install steering valve (1), three washers (3), and bolts (2).
2.
Connect hydraulic hoses, lines, and fittings (WP 0169 00).
3.
Start engine (TM 5-3805-261-10).
4.
Turn steering wheel to the right while moving the machine slowly forward a few feet.
5.
Turn steering wheel to the left while moving the machine slowly forward a few feet.
6.
Repeat steps 4 and 5 at least five times to bleed air from system.
7.
Stop engine.
8.
Inspect hose assemblies and connections for leaks.
9.
Refill hydraulic tank to proper level (WP 0216 00).
END OF WORK PACKAGE
0322 00-3/(-4 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.