• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
STEERING CONTROL PUMP MAINTENANCE - CONTINUED
STEERING CONTROL PUMP MAINTENANCE - CONTINUED

Maintenance Manual For Grader, Road, Motorized, Diesel Engine Driven, Heavy, Commercial Construction Equipment
Page Navigation
  295    296    297    298    299  300  301    302    303    304    305  
img
TM 5-3805-261-23-2
STEERING CONTROL PUMP MAINTENANCE - CONTINUED
0319 00
CLEANING AND INSPECTION
Clean and inspect all parts in accordance with WP 0020 00.
ASSEMBLY
1.
Install new seal and preformed packing (39) and seal (41) on bushing (40).
35
39
38
40
39,40,41
42
41
43
44
397-4322
48
47
46
45
397-4321
NOTE
Lubrication may be necessary for assembly.
2.
Install retainer (48), ball (47), new preformed packing (46), seat (45), new preformed packing (43), and screw (44) in
pump body (35). Tighten screw to 96 lb-in. (11 Nm).
3.
Install new preformed packing (38), sleeve bushing (40), preformed packing (39), seal (41), and snap ring (42) as an
assembly in liquid pump housing (35).
4.
Install spool (31), sleeve (30), and pin (36).
36
5.
Install six springs (37) in spool (31) and sleeve (30).
Ensure curves of springs are in contact and in center of
30
spool.
37
31
397-4320
0319 00-6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.