TM 5-3805-261-10
SECTIONALIZATION FOR AIR TRANSPORT - CONTINUED
0019 00
ASSEMBLY - CONTINUED
67.
Install two retainer caps (20), four washers (19), and bolts (18) on right articulation cylinders (21).
20
18,19
397-1124
18,19
21
20
68.
Store all tools, jumpers, and all other equipment in the tool box on the front of the machine and secure the lid.
WARNING
The ROPS must be installed before operating the grader. Failure to follow this warning may result in injury
to personnel.
69.
Notify Unit Maintenance to install the ROPS and return supports to front of machine.
70.
After approximately one hour of operation, check the pivot pin bolts; tighten if necessary.
END OF WORK PACKAGE
0019 00-39